This article breaks down a $12,000 asphalt shingle re-roof into every line item so you can see exactly where the money goes: shingles ($3,500), underlayment and ice shield ($600), ridge cap and starter strip ($400), drip edge and flashing ($300), nails and incidentals ($150), dump fee ($400), permit ($250), and labor ($6,400). Use this breakdown to vet contractor estimates and spot inflated line items. Pair with our Replacement Cost Guide.

On a typical asphalt reroof, the shingles themselves are well under half the cost. Knowing where the rest goes is what lets you read a quote properly and spot the one that has left something out.

Where the money goes on an asphalt reroof

The lines on a typical shingle roof quote
LineRoughly what it covers
LabourUsually the largest single line — install plus tear-off
ShinglesThree bundles per square plus waste
Tear-off and disposalPer layer; a second layer roughly doubles it
Underlayment and ice barrierWhole-roof coverage plus eaves and valleys
FlashingStep, counter, apron, kickout, pipe boots — all new
Drip edge, starter, ridge capPriced by the linear foot, not the square
VentilationRidge vent, and opening up soffit intake if it is blocked
Nails and fastenersSmall in cost, large in consequence
PermitVaries by jurisdiction; ask whether it is included
Decking replacementA contingency at a per-sheet rate, not a line item

Comparing two quotes properly

Where saving money is false economy

Flashing, underlayment and ventilation. All three are small fractions of the total and all three are what decides whether the roof lasts its rated life. A quote that saves money by reusing flashing is deferring a leak, not avoiding a cost.

Frequently asked questions

What percentage of a roof cost is labour?

Usually the largest single line on an asphalt reroof — larger than the shingles themselves. That is why regional labour rates move a quote more than the choice of shingle brand does.

What is usually left out of a roofing quote?

The permit and replacement decking most often. Decking cannot be quoted in advance because nobody can see it until the shingles are off, so it should appear as a per-sheet contingency rate.

Where is it false economy to save on a roof?

Flashing, underlayment and ventilation. All three are small fractions of the total and all three decide whether the roof reaches its rated life.

How do I compare two roofing quotes fairly?

Line by line against the same scope: is all the flashing new, is drip edge included on eaves and rakes, is starter a real product, what ventilation is included, what is the decking rate, is the permit in the price, and what are both warranties.