Playground Surfacing Calculator

Free playground calculator

As an Amazon Associate I earn from qualifying purchases.

Pea gravel, sand, wood chips or engineered wood fiber for a play area at the CPSC depth, including the 6 ft use zone.

Worked example

With these inputs:

ResultValue
Pea gravel needed43.2 tons
Volume32 yd³
Or in 0.5 cu ft bags1,728 bags
Surfaced area incl. use zone864 sq ft (32 × 27 ft)
Border / containment118 ft
Equipment footprint300 sq ft
Use zone added6 ft each side
Fill depth12 in
Depth after settling (~25%)about 9 in
Cubic feet864 ft³
Density1.35 tons per yd³

CPSC: fill loose surfacing to 12 in so it settles to about 9 in, and keep it at least 9 in — rake it back under slides and swings where it gets kicked out. Swings need a longer use zone front and back (twice the pivot height), and loose fill should never go over concrete or asphalt.

How it works

Loose-fill surfacing under play equipment is a safety layer, so the depth comes from the U.S. Consumer Product Safety Commission rather than taste: fill to 12 inches, which settles to about 9 inches, over the equipment footprint plus a use zone of at least 6 feet on every side. Enter the equipment footprint and material for cubic yards, tons or bags, and the border you need to hold it in.

Frequently asked questions

How deep should pea gravel be under a playground?

Fill to 12 inches. The U.S. Consumer Product Safety Commission's Public Playground Safety Handbook notes that a 12 inch initial fill compresses to about 9 inches over time, and 9 inches is the depth its tables work from for most loose-fill materials. Keep a border tall enough to hold the full 12 inches.

How much pea gravel do I need for a playground?

Add a 6 ft use zone around the equipment, multiply length × width × 1 ft of depth and divide by 27 for cubic yards, then multiply by about 1.35 for tons. A 20 × 15 ft play set becomes 32 × 27 ft = 864 sq ft, which is 32 cubic yards — about 43.2 tons of pea gravel at 12 inches.

How far should playground surfacing extend?

At least 6 feet in every direction from the edge of stationary equipment — the CPSC use zone. Swings need more: the zone in front and behind extends twice the height of the pivot point, so measure those separately and enter the larger footprint.

How much playground mulch do I need?

The same volume as any other loose fill: area × depth. Playground wood chips and engineered wood fiber are sold by the cubic yard or in bags of about 2 cubic feet, so the 864 sq ft example at 12 inches needs 32 cubic yards, or 432 bags. Bulk delivery is usually far cheaper above a few yards.

Can I put playground surfacing on concrete?

Not loose fill. The CPSC handbook warns against installing loose-fill materials over hard surfaces such as concrete or asphalt. Over a hard surface use a unitary surface such as poured-in-place rubber or rubber tiles that are tested for the fall height.

Need the whole roof at once? The free roofing calculator works out roof area, squares, shingle bundles, underlayment, drip edge, ridge cap and installed cost from one set of measurements.